Director of the BIM Research Center, Amirkabir University of Technology
The BIM Research Center, part of the Technical and Executive Systems Research Center, is managed by Bayabim’s CEO.
Bayabim Technology Development
01/ 08
Envelope, slabs and volumes: the first layer of the information model, and in the platform every stakeholder sees the same one.
02/ 08
Columns, beams, slabs and the concrete core at their real sizes, coordinated with the architecture before clashes reach the site.
03/ 08
Chilled and hot water, supply air ducts and cable trays in one model, so clashes are found and fixed before installation.
04/ 08
Chillers, pumps, air handlers and tanks, each with its specification, location and service clearance.
05/ 08
Every element carries data: material, size, manufacturer, status. In the platform, every team works from this data, not from scattered copies.
06/ 08
The schedule is linked to the model (4D) and daily site progress is recorded on it, so every delay is seen the same day. Keep scrolling to build it.
07/ 08
Quantities and estimates come straight from the model (5D), and update with every design change.
08/ 08
After handover, sensors feed temperature, energy and occupancy back to the model: the digital twin is the operations part of the same platform.
The Bayabim platform
Bayabim’s unified project management platform brings the schedule, progress, control reports, the model and the digital twin together, so the project is managed from one shared picture.
Unified project management platform
From the schedule and daily site progress to the information model and the digital twin: each part works on its own, and together they cover the whole project lifecycle.
Each day’s site status is recorded on the MS Project schedule: which tasks started or finished, which fell behind, why, and with what new dates. Dependent tasks move automatically, and the updated schedule is exported in MS Project format.
Discover the platform Project Control DashboardsPercent complete, planned and actual S-curves, the list of tasks behind plan, and the workforce, in a report that is up to date every day, ready to print.
Discover the platform BIMThe project’s technical record in the platform: coordinating disciplines and detecting clashes before construction, and linking the model to time (4D) and cost (5D).
Read more VDCA way of working that coordinates the model, the schedule and the project team’s decisions in one process: building the project digitally before it is built for real.
Read more Digital TwinAfter handover, live data from sensors and building systems is linked to the model, so the operating asset can be monitored, analysed and forecast.
Read moreAbout Bayabim
Bayabim Technology Development is one of Iran’s pioneers in Building Information Modeling (BIM) and digital twins, and has brought that experience together in a unified project management platform: one place for the schedule, progress, project control reports, the model and operational data.
What sets Bayabim apart is practical experience combined with a scientific, institutional approach: a seat on the board of the Scientific and Professional Association of BIM, and management of the BIM department of the Technical and Executive System Research Center at Amirkabir University of Technology.
Certificates
Bayabim’s achievements in BIM and digital twins are the foundation of the platform it now offers for unified project management.

The BIM Research Center, part of the Technical and Executive Systems Research Center, is managed by Bayabim’s CEO.

Judging and speaking at several editions of the BIM Conference, and a member of its strategic committee.

The only active BIM company with a seat on the boards of both the scientific and the professional associations of the industry.

OPEN BIM award for modelling an industrial wastewater treatment and water reclamation plant.
Our projects
Partners






Contact us for a demo of the unified project management platform or a consultation on your project; the first session is free.