Our Solution: VDC (Virtual Design and Construction)

By maximizing innovation, we unlock the potential of our clients

Free Consultation

    Contact Center:

    9123272402 98+

    Virtual Design Construction

    Virtual Construction

    A new concept in the construction industry that leverages digital technologies to coordinate and optimize the design, planning, construction, and operation of projects in an intelligent and integrated manner

    Virtual Construction

    Virtual Design and Construction (VDC) is an innovative concept in the construction industry that leverages digital technologies to coordinate and intelligently execute the design, planning, construction, and operation of projects. VDC goes beyond Building Information Modeling (BIM) and aims to integrate design, engineering, construction, and operation processes in a data-driven virtual environment.


    🔹 Definition of VDC (Virtual Design and Construction)

    In simple terms, VDC means:

    Designing, planning, and managing the construction process in a digital environment before actual project execution.

    This concept includes:

    • Building Information Modeling (BIM)

    • Construction planning (4D, 5D, and beyond)

    • Stakeholder coordination (owner, designer, contractor)

    • Simulation of technical, time, and financial performance before execution


    🔹 Key Components of Virtual Design and Construction (VDC)

    1. BIM (Building Information Modeling):

      • Creating an intelligent digital model of the project (architecture, structure, MEP)

      • The fundamental basis of VDC for information integration.

    2. PPM (Project Production Management):

      • Managing project planning and control through data-driven approaches

    3. ICE (Integrated Concurrent Engineering):

      • Simultaneous collaboration of teams in a shared digital environment for fast decision-making

    4. Simulation:

      • Simulating execution processes, energy consumption, cost, time, etc. for pre-construction analysis


    🔹 Benefits of Using VDC

    BenefitDescription
    Error and rework reductionErrors are identified before construction through simulations
    Improved team coordinationAll stakeholders collaborate on a unified digital model
    Reduced project cost and timeMore accurate decision-making and optimized planning
    Higher construction qualityThrough precise and consistent data
    Performance analysisIncluding energy, carbon, cost, maintenance, and safety

    🔹 Difference Between VDC and BIM

    FeatureBIMVDC
    Focus3D building information modelManagement of the entire project lifecycle
    ToolsModeling software (Revit, Navisworks, etc.)Combination of BIM + planning + concurrent collaboration
    GoalCreating a digital modelDecision-making, optimization, and successful execution

    🔹 Applications of VDC in Advanced Projects

    • Large-scale infrastructure projects (metro, highways, power plants)

    • Hospitals and airports

    • Government-funded or high-coordination construction projects

    • Green projects aimed at reducing energy consumption and carbon footprint


    🔹 Conclusion

    Virtual Design and Construction (VDC) is a digital transformation in the construction industry that integrates technology, data, and multidisciplinary collaboration to reduce risks, enhance efficiency, and enable the successful delivery of complex projects. In developed countries, it is recognized as the golden standard of construction management, and in Iran, it is entering large-scale infrastructure and government projects.

    Questions?

    Yes, the implementation of VDC in Iran is absolutely feasible, especially in large-scale governmental and infrastructure projects. The software infrastructure (such as Revit, Navisworks, Synchro, etc.) and the pool of skilled professionals in the country are steadily growing. Moreover, with organizations like the Plan and Budget Organization and institutions such as Tehran Municipality moving toward Building Information Modeling (BIM), the legal and operational framework for adopting VDC is also being established.

    Currently, companies such as BayaBIM are actively developing VDC services in hospital, metro, and building projects, demonstrating that the localization of this technology is both achievable and beneficial.

    Virtual Design and Construction (VDC) transforms project management. The main advantages are:

    • Cost Reduction: Through precise simulation and prevention of rework

    • Shorter Construction Time: By optimizing planning and coordination among teams

    • Improved Quality and Safety: By identifying risks and resolving conflicts before execution

    • Better Decision-Making: Using real data and project performance simulations

    • Energy, Carbon, and Cost Control: To achieve sustainability and economic goals

    Globally, VDC has become the gold standard in advanced project management. Countries such as:

    • 🇺🇸 USA: Companies like DPR Construction and Stanford CIFE are pioneers in VDC development.

    • 🇸🇪 Sweden and Finland: Governments have mandated BIM/VDC implementation in public projects.

    • 🇸🇬 Singapore: With the establishment of BCA and BIM legal requirements, digital construction has reached maturity.

    Reports indicate that implementing VDC can:

    • Save up to 25% in costs

    • and up to 30% in project execution time.

    Developing countries are also rapidly entering this space, and Iran, given its current infrastructure, has the potential for regional competitiveness.

    🧩 Steps to Implement VDC in a Company:

    1. Kick-off / Needs Assessment Meeting:

    • Attendees: Project Manager, Technical Team (BIM), Client, and Consultant

    • Objective: Define goals, constraints, expectations, and digital project requirements

    2. Preparation of EIR (Employer’s Information Requirements):

    • This document serves as the client’s roadmap and defines:

      • What information is required?

      • At what Level of Detail (LOD)?

      • At which stages/times?

      • In which formats?

    • This document will form the basis for the entire BIM and VDC program.

    3. Development of BIM/VDC Strategy:

    • Prepared by the consultant or BIM team

    • Includes:

      • Digital team structure (BIM Manager, Coordinator)

      • Tools and software to be used (Revit, Navisworks, Synchro, Power BI)

      • Information exchange framework (ISO 19650 or local standards)

    4. Team Training and Empowerment:

    • Intensive courses for engineers and project managers

    • Training on software and collaborative processes (ICE, CDE, etc.)

    5. Gradual Implementation of VDC in a Pilot Project:

    • Controlled execution in a single phase of a real project

    • Evaluation of results and issue resolution


    💰 Estimated Cost of Implementing VDC in Companies

    Costs depend on project size, contract type, and level of implementation. Approximate items include:

    ItemEstimated Cost (IRR)
    Kick-off meeting and EIR preparationAccording to professional association rates
    BIM/VDC strategy designAccording to professional association rates
    Pilot implementation in a projectAccording to professional association rates
    Continuous training and consultingAccording to professional association rates

    Note: Implementing VDC in a large project typically results in 10–20% savings in total construction costs, making these investments quickly recoverable.